Draycombe
Get a quote

The first thing we measure is whether it fits.

Not what you want up there. How much headroom exists over the staircase once the new floor is in. If the answer is that the ridge is too low, you hear it on the first visit rather than after a set of drawings you have paid for.

FMB member · CIOB registered Measured survey before any drawing Leeds & North Yorkshire

Before anything else

Is there a room
up there at all?

Measure floor to ridge in your loft, set it below, and see what is left once the new floor is built up. Everything else about a conversion is a preference. This part is not.

1.8 m3.6 m
2.25 m Headroom after the new floor
2.2 m The practical minimum over the stair
New floor, 350mm of build-up
A new floor eats about 350mm before you stand on it, which is the figure people forget when they measure their own loft with a tape.

Where the numbers come from
  • 2.2 metres measured from the top of the NEW floor to the underside of the ridge, taken over the position the staircase will land. Below that you can still build something, and it is a store rather than a bedroom.
  • Permitted development allows 40 cubic metres of extra roof volume on a terraced house and 50 on a semi or detached, provided nothing extends beyond the existing roof plane on the principal elevation.
  • A party wall notice must be served 2 months before work starts, and a loft conversion almost always affects one.

A tape measure and this slider get you to a yes or a no. Everything after that needs a survey.

02

The route, not the drawing

Most lofts need no
planning permission at all.

Permitted development allows 40 cubic metres of extra roof volume on a terraced house and 50 on a semi or detached, as long as nothing breaks the existing roof plane on the front elevation. Most of what we draw falls inside that, which takes months out of the programme.

The exceptions are conservation areas, houses that have already been extended, and anything that needs a front dormer. We establish which applies at the survey, because designing first and discovering the constraint afterwards is how an extension ends up smaller than the drawings you fell in love with.

A party wall notice runs 2 months and a loft conversion almost always needs one, so we serve it early rather than at the point it becomes the thing holding everybody up.

Loft conversions and extensions, drawn before they are sold.

The drawing

What is actually
up there.

Scroll, and the section builds. This is the drawing we would put in front of you at the second meeting, and it is the one that decides whether you have a bedroom or a very expensive cupboard.

Section drawing through a terraced house with a rear dormer loft conversion The existing roof and floors are drawn first, then the new floor structure, the rear dormer, the staircase and the finished room. Ground First floor Roof space, unusable New floor structure, spanning the existing walls Rear dormer 2.2m headroom New stair Bedroom and ensuite
  1. As existingRidge height and joists measured, before anything is drawn.
  2. New floorSpanning the load-bearing walls, not the ceiling joists that are already there.
  3. DormerSized to the 40 cubic metre permitted development allowance on a terrace.
  4. Stair and room2.2 metres over the stair landing, which is the measurement that decides everything.

How we work

The measure comes
before the drawing.

  1. 01

    A visit and a tape measure

    An hour at the house. We measure the ridge, the stair, and the ceiling joists, and we tell you on the day whether the room you are imagining exists.

  2. 02

    The measured survey

    Everything recorded properly and drawn up as existing. This is the drawing every later decision is checked against.

  3. 03

    Design and route

    Two or three options drawn, and the planning route named: permitted development, prior approval or full application. The route changes the programme more than the design does.

  4. 04

    Structure and building control

    Steel sizes calculated by our engineer, drawings submitted, the building control route agreed before anyone lifts a tile.

  5. 05

    Build

    Eight to twelve weeks for a typical dormer conversion. One team, on your job, until it is finished.

186
Conversions completed
94%
Finished on programme
2
Teams, deliberately
2009
Drawing since

What people say

They told us at the first visit that the ridge was too low for the bedroom we wanted and drew us a study instead. Every other firm had quoted the bedroom.

Helen R. · Headingley

The programme said ten weeks and it took ten weeks. After two previous builders I had stopped believing that was possible.

Tom and Priya S. · Chapel Allerton

The structural engineer walked the roof himself before the steels were specified. It sounds obvious and apparently it is not.

Graham W. · Horsforth

The loft, assembled

Section through a loft conversion The existing house in graphite and the new work in red: the new floor and its joists, the rear dormer, the new stair up to the loft, the retained roof slope to the ridge, and the 2.2 metre headroom over the stair. Ridge Floor Stair Dormer Ridge Headroom 2.2 m
  1. 01Ridge
  2. 02Floor
  3. 03Dormer
  4. 04Stair
  5. 05Headroom

An hour and a tape measure,
before anything is drawn.

We measure the ridge, the stair and the joists, and tell you on the day whether the room you are imagining exists. If it does not, that visit has saved you a set of drawings.

Book the survey
Demo build by Etari Digitals