How we work
The measure comes
before the drawing.
Draw first and the survey becomes a document that has to agree with a picture you have already fallen for. Measure first and the drawing is simply what the roof allows.
- 01
A visit and a tape measure
An hour at the house. We measure the ridge, the stair, and the ceiling joists, and we tell you on the day whether the room you are imagining exists.
- 02
The measured survey
Everything recorded properly and drawn up as existing. This is the drawing every later decision is checked against.
- 03
Design and route
Two or three options drawn, and the planning route named: permitted development, prior approval or full application. The route changes the programme more than the design does.
- 04
Structure and building control
Steel sizes calculated by our engineer, drawings submitted, the building control route agreed before anyone lifts a tile.
- 05
Build
Eight to twelve weeks for a typical dormer conversion. One team, on your job, until it is finished.
The party wall
2 months, served early
A loft conversion almost always affects a wall you share, so notice has to be served 2 months before work starts. It is a formality in most cases and a real delay in a few, which is exactly why we serve it at the start rather than when the programme needs it.
Asked often