Rear extensions
Single and double storey, through the planning route the site actually allows.
Most rear extensions we draw fall under permitted development or prior approval rather than full planning, which changes the timeline by months. We establish which route applies before design, because designing first and discovering the constraint afterwards is how an extension ends up smaller than the drawings you fell in love with.
A visit and a tape measure
An hour at the house. We measure the ridge, the stair, and the ceiling joists, and we tell you on the day whether the room you are imagining exists.
The measured survey
Everything recorded properly and drawn up as existing. This is the drawing every later decision is checked against.
Design and route
Two or three options drawn, and the planning route named: permitted development, prior approval or full application. The route changes the programme more than the design does.
Structure and building control
Steel sizes calculated by our engineer, drawings submitted, the building control route agreed before anyone lifts a tile.
Build
Eight to twelve weeks for a typical dormer conversion. One team, on your job, until it is finished.
Asked often
Will I need planning permission?
How much headroom do I actually need?
What is a party wall notice?
How long does it take?
Loft conversions
Dormer, hip-to-gable and rooflight conversions, drawn to the ridge height you actually have.
Drawings and structure
Measured survey, planning drawings, structural calculations, building control.
The build
One team on one job at a time, one written programme, and one person who answers the phone when you ring about it.